Products
Pre-cooling Tunnel(Vertical)
high quality
Description
Download
Chocolate Cooling Tunnel Series | |||||
No. | Product | Running Speed | Power | Weight | Dimension |
D1 | Pre-cooling Tunnel(Horizontal) | ≤12 mould/min | 5.3 Kw | 950.0 Kw | 2.3m*1m*2.5m |
D2 | Final cooling Tunnel(Horizontal) | ≤12 mould/min | 15.2 Kw | 2350.0 Kw | 8.3m*1m*2.4m |
D3 | Pre-cooling Tunnel(Vertical) | ≤12 mould/min | 5.3 Kw | 950.0 Kw | 2.3m*1m*2.5m |
D4 | Final cooling Tunnel(Vertical) | ≤12 mould/min | 15.2 Kw | 1850.0 Kw | 6.3m*1m*2.4m |
D5 | Large Final cooling Tunnel(Vertical) | ≤24 mould/min | 27.5 Kw | 3120.0 Kw | 12.6m*1m*2.4m |
Equipment Overview
The pre-cooling tunnel is applicable for product pre-cooling, which is featured by up-down translational design, small covering area, energy saving of more than 30%, advanced equipment control system, visible display and easy operation.
Equipment Description
Pre-cooling Tunnel [Type: LSD-2*18A]
■ Up-down and translational design;
■ Mold quantity: 36 pcs;
■ Energy-saving of more than 30%;
■ Running speed: ≤20molds/min.;
■ Water cooling or wind cooling;
■ Auto start or stop due to machine failure;
■ Small covering area..
Share your thoughts
6
0
Read more
Your rating
*
Name *
Email *
Upload Image
Notice: Ensure your image is no larger than 200KB before uploading.
Submit
Contact Us Now
Enter your inquiry details, We will reply you in 24 hours.
Name can't be empty
E-mail can't be empty
Company can't be empty
Phone can't be empty
Phone
Products can't be empty
Products you want
Message can't be empty
Verification code error
Clear
People who viewed this item also viewed